I am trying to make the page loading easier, and I was curious what DB is in ...:
Completed in 6427ms (View: 6279, DB: 96)
... mean?
Because 6279 + 96! = 6427ms
Guide Rail Quotation :
Completed in 5ms (View: 2, DB: 0) | 200 OK [http://0.0.0.0/items]
This data is simple enough to understand. Rails uses the millisecond (ms) as an indicator to measure the time taken. The full request was spent 5 ms inside Rails, of which 2 ms were rendering rendering and communication with the database. It is safe to assume that the remaining 3 ms were spent inside the controller.
Source: https://habr.com/ru/post/1340183/More articles:AvalonEdit WPF TextEditor (SharpDevelop): how to highlight a specific range of text? - c #Django on MySQL: how to enable auto-sorting? - djangoto convert NSManagedObject master data to JSON on iPhone? - jsonHow to find file extension using UNIX? - unixEntity Framework 4 Include + Table join does not work together - c #Doc Automation to PDF in C # - c #Print value to file - ocamltracking the cause of the error "could not open a connection with the OID" - postgresqlHow can I reorganize this Ruby and Rails code? - ruby | fooobar.comrequestFiltering allowDoubleEscaping = "True" for one page? - asp.netAll Articles