For example, I record the duration for an event and would like to view the graph with the Y axis as a counter and the X axis as a duration (which is written as an integer), so I can see the time distribution the event takes. How can i do this? Kibana seems to expect the X axis to be a time-based value and will not contain primes. Is there any way around this, I miss? Is there any logic to this limitation that I am missing?
source share